Saturation and the nature of the pore system are uncertain from these results, but productivity appears to be associated with larger-scale discrete porosity features such as fractures and vugs<\/li>\n<\/ul>\nAdditional log testing will be required<\/h3>\n
Not all desired wireline data could be acquired by Baker Hughes due to a lack of fluid level in the borehole, and as a result, additional logs are planned to further assess reservoir characteristics and the porosity types prior to the well testing programme.<\/p>\n
In addition, to refine the petrophysical interpretation further, the Company is having additional lab analysis performed on the drill cuttings and the LOD-6 (2011 discovery well) drill core.<\/p>\n
Thomas Abraham-James, President and CEO of Pulsar Helium, said: \u201cWe are delighted to receive these initial positive results from the Jetstream #1 appraisal well.<\/p>\n
\u201cWe are acquiring the complementary wireline log data, pressure and flow tests, and additional lab results as part of our ongoing testing programme and look forward to updating shareholders as we progress.\u201d<\/p>\n
Update on flow-testing and pressure build-up programme<\/h3>\n
Pulsar is awaiting the lifting of Spring road restrictions. It will then commence a well testing package that includes flow testing and pressure build-up programme, collect pressurised gas samples for laboratory analysis and install production tubing.<\/p>\n
This programme will now be expanded to include additional wireline data acquisition as recommended by Asia-Pacific Formation Evaluation Services Pty Ltd.<\/p>\n","protected":false},"excerpt":{"rendered":"
Pulsar has received the wireline log interpretation for the Jetstream #1 appraisal well at the Topaz helium project in Minnesota.<\/p>\n","protected":false},"author":22,"featured_media":45706,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[24502,23535],"tags":[24483,24471],"acf":[],"yoast_head":"\n
Pulsar Helium: Positive wireline log for Jetstream #1 appraisal well<\/title>\n\n\n\n\n\n\n\n\n\n\n\n\n\t\n\t\n\t\n\n\n\n\n\n\t\n\t\n\t\n