{"id":10151,"date":"2021-03-18T15:40:25","date_gmt":"2021-03-18T15:40:25","guid":{"rendered":"https:\/\/www.innovationnewsnetwork.com\/?p=10151"},"modified":"2022-02-03T15:49:22","modified_gmt":"2022-02-03T15:49:22","slug":"united-lithium-corp-lithium-drilling-programme","status":"publish","type":"post","link":"https:\/\/www.innovationnewsnetwork.com\/united-lithium-corp-lithium-drilling-programme\/10151\/","title":{"rendered":"United Lithium Corp reveals three-phase lithium drilling programme"},"content":{"rendered":"
United Lithium Corp has announced it intends to complete its acquisition of the Bergby Lithium Project<\/a>, located in central Sweden, 25 km north of Gavle,during the second quarter of 2021.<\/p>\n The company is planning a lithium drilling programme that will begin after the acquisition is completed and is to be carried out in three phases; it is currently expected that the programme will finalised on or before 31 December, 2021.<\/p>\n During phase one of the programme, the company will drill 3000 metres, along strike and down dip from previously indicated lithium mineralisation at the site.<\/p>\n It will also perform a heliborne magnetic and radiometric airborne survey to test for structural controls on pegmatites which could bear lithium<\/a> as well as on general geology and faulting. Along with this, it will conduct a high resolution airborne lidar survey in order to deliver a thorough topographic surface representation.<\/p>\n Between phase one and two, the company will surface and drill core samples for metallurgical test work to quantify recoveries of any lithium mineralisation from the project.<\/p>\n